Cunningham Installation

Viewing 4 posts - 1 through 4 (of 4 total)
  • Author
    Posts
  • #6464
    mcummingsny
    Participant

    The instructions provided with the 6:1 cunningham kit (cleat on mast) show the becket and cheek blocks installed on the port side of the mast with a line passing through the grommet above the tack.  The instructions then note that this line forms a “continuous loop on the starboard side.”  What does the loop on the starboard side attach to/run through?
    For clarity, I have attached a .pdf of the instructions themselves.
    Thanks!  FS 3727
     
     

    #13536
    abl1111
    Participant

    From a pix I just saw online – it looks like it runs through the gooseneck attachement.

    #13537
    mcummingsny
    Participant

    True, but it scacely seems an elegant solution.  And the line provided for that purpose is only 2.5 feet.

    #13538
    abl1111
    Participant

    Agreed, but sturdy and functional without adding something to the boom to hold it in place.   I don’t have a cunningham, I don’t race – but have thought of adding something to allow me to hank the main down a bit to maximize shape.
    Good luck.
     

Viewing 4 posts - 1 through 4 (of 4 total)
  • You must be logged in to reply to this topic.
Shopping Cart
Scroll to Top